Commercial EWI · England
Commercial and public building EWI in Greater London
Planning commercial external wall insulation anywhere in Greater London? We cover towns including Islington and Bexley, and check planning and building control for each address. For commercial premises in Greater London, we programme the work around opening hours so the building can keep trading.
- Free survey and fixed written price
- Guide price from £110 per m² + scaffold, + VAT
- Planning and building control checked for England
Free survey in Greater London
Tell us the postcode and what you need.
Included as standard
- Colour and texture options to suit brand or setting
- Planning applications supported with drawings and finish samples
- Clear handover file with system documentation
- Contract roles under CDM 2015 agreed at the start
- Programmes phased around opening hours and term dates

Homes and walls in Greater London
London's housing includes a large stock of Victorian and Edwardian solid-wall terraces, inter-war semis and post-war blocks, and conservation areas cover many streets — so planning is often the first question for external work.
Much of Greater London sits in the lower wind-driven rain exposure bands, which keeps the choice of finishes wide — though hilltop, coastal and exposed gable walls can still need a tougher specification, so we check the actual site.
For commercial premises in Greater London, we programme the work around opening hours so the building can keep trading.
- Nation
- England
- Region
- London
- Towns covered
- Islington, Bexley, Archway, Sutton, Croydon, Ilford, Enfield, Harrow…
- Guide price
- From £110 per m² + scaffold · + VAT
Permissions in England
For houses, external wall insulation and render are often permitted development where the finish looks similar to the existing walls. Planning permission is usually needed in conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites (where cladding a house in stone, artificial stone, pebble dash, render, timber, plastic or tiles isn't permitted development), for flats and maisonettes, for commercial buildings, under an Article 4 direction, or where the look changes noticeably. Listed buildings need listed building consent.
Renovating more than half of a wall's area — insulating it, or stripping and re-rendering it — or more than a quarter of the building's whole external envelope brings in the energy requirements of Part L, so building control needs to be involved and the wall should reach about 0.30 W/m²K where that's technically, functionally and economically feasible.
Combustible materials are banned in the external walls of relevant buildings 18 metres and over (regulation 7(2)), and Approved Document B guidance also covers residential buildings with a storey 11 metres or more above ground. Higher-risk buildings go through the Building Safety Regulator.
Which system suits a commercial building?
The building's height, use (for example, residential or assembly use) and fire strategy shape the choice. Mineral wool systems are typical for multi-storey and public buildings; EPS may suit single-storey units. The system manufacturer's classification is confirmed in writing.
Commercial and public building EWI prices in Greater London
| Item | Guide price | Notes |
|---|---|---|
| Insulated render system | £110–£200 per m²+ VAT | Priced on survey |
| Render refurbishment without insulation | £55–£95 per m²+ VAT | Silicone or mineral |
| Access and scaffold | Per building | Includes edge protection |
Confirmed by a fixed written quote after survey. Business prices shown before VAT, which is added at 20%. Buildings used solely for a relevant charitable purpose can qualify for 0% on insulation.
What happens next
Get a guide price
Try the online quote tool for a ballpark figure.
Book the survey
A visit at a time that suits you.
Agree the quote
Nothing starts until you've signed the written price.
We do the work
Planned around weather, with you kept informed.
Commercial EWI in Greater London: questions
Is VAT 0% on commercial insulation?
Usually not. The zero rate covers insulation installed in residential accommodation and, since 1 February 2024, buildings used solely for a relevant charitable purpose, such as many charity-run village halls. Other commercial work is standard-rated.
Do you handle the planning application?
We provide the technical information, drawings and samples an application needs; your agent or our designer can submit it.
Do you provide a maintenance plan?
Yes — the handover includes the system documents and recommended inspection and cleaning intervals.
Do you cover all of Greater London?
Yes. We survey and quote commercial external wall insulation across Greater London, including Islington, Bexley, Archway, Sutton, Croydon.
Do I need planning permission in England?
For houses, external wall insulation and render are often permitted development where the finish looks similar to the existing walls. We check your address before quoting.