Free survey · Fixed written price · UK-wideCall free 0800 088 6248

Commercial EWI · England

Commercial and public building EWI in Greater Manchester

Commercial and public building EWI across Greater Manchester: measured survey, clear specification and a fixed written price before any work starts. We provide drawings and finish samples for planning applications on Greater Manchester commercial buildings.

  • Free survey and fixed written price
  • Guide price from £110 per m² + scaffold, + VAT
  • Planning and building control checked for England

Free survey in Greater Manchester

Tell us the postcode and what you need.

Enter a valid UK postcode.

Choose a service.

Enter your name.

Enter a phone number we can call.

Check the email address.

We use your details only to respond to this enquiry. See our privacy notice.

What the job covers

  • Colour and texture options to suit brand or setting
  • Non-combustible systems where use or height requires them
  • Clear handover file with system documentation
  • Programmes phased around opening hours and term dates
  • Planning applications supported with drawings and finish samples
A two-storey commercial building finished in white insulated render with a charcoal plinth and dark windows

Before we quote in Greater Manchester

The North West has one of the largest stocks of pre-1919 solid-wall terraces in England, alongside Pennine stone houses and post-war estates.

Exposure to wind-driven rain varies across Greater Manchester: sheltered town streets fare better than walls on high ground or facing the prevailing weather, and the render, beads and cill details are chosen with that in mind.

For commercial premises in Greater Manchester, we programme the work around opening hours so the building can keep trading.

Nation
England
Region
North West
Towns covered
Manchester, Oldham, Wigan, Bolton, Stockport, Salford, Rochdale, Bury…
Guide price
From £110 per m² + scaffold · + VAT

England: planning and regulations

For houses, external wall insulation and render are often permitted development where the finish looks similar to the existing walls. Planning permission is usually needed in conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites (where cladding a house in stone, artificial stone, pebble dash, render, timber, plastic or tiles isn't permitted development), for flats and maisonettes, for commercial buildings, under an Article 4 direction, or where the look changes noticeably. Listed buildings need listed building consent.

Renovating more than half of a wall's area — insulating it, or stripping and re-rendering it — or more than a quarter of the building's whole external envelope brings in the energy requirements of Part L, so building control needs to be involved and the wall should reach about 0.30 W/m²K where that's technically, functionally and economically feasible.

Combustible materials are banned in the external walls of relevant buildings 18 metres and over (regulation 7(2)), and Approved Document B guidance also covers residential buildings with a storey 11 metres or more above ground. Higher-risk buildings go through the Building Safety Regulator.

Does commercial EWI need planning permission?

Generally yes — permitted development rights for external wall changes are written for houses. Applications need elevations showing the projection, finish and colours, and details at eaves and openings.

Commercial and public building EWI prices in Greater Manchester

Commercial and public building EWI guide prices
ItemGuide priceNotes
Insulated render system£110–£200 per m²+ VATPriced on survey
Render refurbishment without insulation£55–£95 per m²+ VATSilicone or mineral
Access and scaffoldPer buildingIncludes edge protection

Confirmed by a fixed written quote after survey. Business prices shown before VAT, which is added at 20%. Buildings used solely for a relevant charitable purpose can qualify for 0% on insulation.

From enquiry to finished wall

  1. Enquiry

    Send your postcode and a few details.

  2. Measured survey

    Walls, damp, eaves, cills and services recorded.

  3. Written price

    A fixed price with the specification attached.

  4. Work and handover

    Installed, inspected and documents handed over.

Commercial EWI in Greater Manchester: questions

Can the building stay open during the works?

Usually, yes. The work is phased and the scaffold layout keeps entrances and escape routes clear.

Do you handle the planning application?

We provide the technical information, drawings and samples an application needs; your agent or our designer can submit it.

Do you provide a maintenance plan?

Yes — the handover includes the system documents and recommended inspection and cleaning intervals.

Do you cover all of Greater Manchester?

Yes. We survey and quote commercial external wall insulation across Greater Manchester, including Manchester, Oldham, Wigan, Bolton, Stockport.

Do I need planning permission in England?

For houses, external wall insulation and render are often permitted development where the finish looks similar to the existing walls. We check your address before quoting.

Commercial EWI in Greater Manchester

Book a free survey in Greater Manchester — no obligation.

Call freeGet a quote