Commercial EWI · Hampshire
Commercial and public building EWI in Eastleigh
Commercial and public building EWI in Eastleigh: free survey, written specification and a fixed price, with the details that keep walls dry planned from the start. Schools and community buildings around Eastleigh are usually phased by elevation, with noisy stages in holidays where possible.
- Free survey in SO50 and nearby
- Guide price from £110 per m² + scaffold, + VAT
- Fixed written price before work starts
Free survey in Eastleigh
Postcode, service and a phone number is all we need.
Included as standard
- Contract roles under CDM 2015 agreed at the start
- Planning applications supported with drawings and finish samples
- Programmes phased around opening hours and term dates
- Non-combustible systems where use or height requires them

Before we quote in Eastleigh
We also cover Southampton and Winchester, close to Eastleigh. Eastleigh sits around 5 miles from Southampton. Homes across the South East range from inter-war semis and post-war estates, which are mostly cavity-walled, to older solid-walled cottages and Victorian town terraces.
Exposure to wind-driven rain varies across Hampshire: sheltered town streets fare better than walls on high ground or facing the prevailing weather, and the render, beads and cill details are chosen with that in mind.
For commercial premises in Eastleigh, we programme the work around opening hours so the building can keep trading.
- Postcode district
- SO50
- County or area
- Hampshire
- Nation
- England
- Nearby
- Southampton, Winchester, Totton, Hythe
Permissions in England
Planning in Eastleigh follows England's national rules: similar-looking finishes on houses are usually permitted, while flats, commercial premises, conservation areas and streets under an Article 4 direction need an application.
If the work covers more than half of a wall, or a quarter of the building's whole envelope, it counts as renovating a thermal element, with a target of about 0.30 W/m²K where feasible.
On residential buildings with a storey 11 metres or more above ground, guidance points to non-combustible external wall materials, and combustible materials are banned in relevant buildings 18 metres and over, so we specify mineral wool systems there.
Does commercial EWI need planning permission?
Generally yes — permitted development rights for external wall changes are written for houses. Applications need elevations showing the projection, finish and colours, and details at eaves and openings.
Commercial and public building EWI prices in Eastleigh
| Item | Guide price | Notes |
|---|---|---|
| Insulated render system | £110–£200 per m²+ VAT | Priced on survey |
| Render refurbishment without insulation | £55–£95 per m²+ VAT | Silicone or mineral |
| Access and scaffold | Per building | Includes edge protection |
Confirmed by a fixed written quote after survey. Business prices shown before VAT, which is added at 20%. Buildings used solely for a relevant charitable purpose can qualify for 0% on insulation.
From enquiry to finished wall
Enquiry
Send your postcode and a few details.
Measured survey
Walls, damp, eaves, cills and services recorded.
Written price
A fixed price with the specification attached.
Work and handover
Installed, inspected and documents handed over.
Commercial EWI in Eastleigh: questions
Is VAT 0% on commercial insulation?
Usually not. The zero rate covers insulation installed in residential accommodation and, since 1 February 2024, buildings used solely for a relevant charitable purpose, such as many charity-run village halls. Other commercial work is standard-rated.
Do you provide a maintenance plan?
Yes — the handover includes the system documents and recommended inspection and cleaning intervals.
Do you handle the planning application?
We provide the technical information, drawings and samples an application needs; your agent or our designer can submit it.
Do you cover Eastleigh?
Yes — we survey and quote commercial external wall insulation in Eastleigh (SO50) and nearby Southampton, Winchester and Totton, with a fixed written price before any work starts.