Free survey · Fixed written price · UK-wideCall free 0800 088 6248

Flats and blocks · Greater Manchester

EWI for flats and blocks in Heywood

EWI for flats and blocks in Heywood: free survey, written specification and a fixed price, with the details that keep walls dry planned from the start. On mixed-tenure blocks in Heywood, we agree access and resident notices with the managing agent before scaffold goes up.

  • Free survey in OL10 and nearby
  • Guide price from £110 per m² + scaffold, 0% VAT
  • Fixed written price before work starts

Free survey in Heywood

Postcode, service and a phone number is all we need.

Enter a valid UK postcode.

Choose a service.

Enter your name.

Enter a phone number we can call.

Check the email address.

We use your details only to respond to this enquiry. See our privacy notice.

Part of every quote

  • One programme and one finish across the whole building
  • Cavity barriers and fire-stopping detailed at compartment floors
  • Planning permission is needed for flats and maisonettes
  • We work with managing agents on resident communication
A five-storey block of flats half re-clad in white and grey insulated render, with scaffolding on the brick half

Local considerations in Heywood

As well as Heywood itself, we quote in Middleton, Rochdale and Bury. Heywood sits around 8 miles from Manchester. The North West has one of the largest stocks of pre-1919 solid-wall terraces in England, alongside Pennine stone houses and post-war estates.

Exposure to wind-driven rain varies across Greater Manchester: sheltered town streets fare better than walls on high ground or facing the prevailing weather, and the render, beads and cill details are chosen with that in mind.

Freeholders and managing agents in Heywood get a written specification and pricing they can share with owners.

Postcode district
OL10
County or area
Greater Manchester
Nation
England
Nearby
Middleton, Rochdale, Bury, Royton

Permissions in England

Before quoting in Heywood, we check whether the property is in a conservation area, under an Article 4 direction or listed, because that decides whether changing the outside needs planning permission.

If the work covers more than half of a wall, or a quarter of the building's whole envelope, it counts as renovating a thermal element, with a target of about 0.30 W/m²K where feasible.

On residential buildings with a storey 11 metres or more above ground, guidance points to non-combustible external wall materials, and combustible materials are banned in relevant buildings 18 metres and over, so we specify mineral wool systems there.

Who needs to agree to EWI on a block?

The freeholder or management company commissions the work, but leaseholders usually pay through the service charge. In England and Wales, major works above the statutory threshold trigger the Section 20 consultation process before a contract is placed. We provide the specification and pricing you need for that consultation.

EWI for flats and blocks prices in Heywood

EWI for flats and blocks guide prices
ItemGuide priceNotes
Mineral wool system on a low-rise block£110–£190 per m²0% VATPriced on survey
Scaffold and accessPriced per buildingIncludes licences where needed
Specification and pricing pack for consultationIncluded with quote

Confirmed by a fixed written quote after survey. 0% VAT: installing insulation in a home is zero-rated until 31 March 2027, so these figures are the total; 5% applies from 1 April 2027.

From enquiry to finished wall

  1. Tell us about the property

    Use the quote tool or form, or call. Photos help.

  2. Free survey

    We measure, check the walls and confirm approvals.

  3. Fixed written quote

    System, details, access, exclusions and VAT in writing.

  4. Installation

    Scheduled for suitable weather, with a clear programme.

Flats and blocks in Heywood: questions

Who pays for EWI on a leasehold block?

In England and Wales, usually the leaseholders through the service charge, depending on the lease, and the landlord must follow the Section 20 consultation process for major works.

Can one flat have external wall insulation on its own?

Rarely. The outside walls are usually owned by the freeholder, the result would look patchy, and planning is unlikely. Whole-building schemes are the norm.

Do flats need planning permission for EWI?

Yes. Permitted development rights for external alterations apply to houses, not flats or maisonettes, so an application is needed.

Do you cover Heywood?

Yes — we survey and quote EWI for flats and blocks in Heywood (OL10) and nearby Middleton, Rochdale and Bury, with a fixed written price before any work starts.

Flats and blocks in Heywood

Send your postcode and we'll arrange a survey in Heywood.

Call freeGet a quote