Free survey · Fixed written price · UK-wideCall free 0800 088 6248

Flats and blocks · England

EWI for flats and blocks in Hampshire

Get guide prices online, then a free survey and fixed quote for EWI for flats and blocks in Hampshire, including Portsmouth and Basingstoke. Freeholders and managing agents in Hampshire get a written specification and pricing they can share with owners.

  • Free survey and fixed written price
  • Guide price from £110 per m² + scaffold, 0% VAT
  • Planning and building control checked for England

Free survey in Hampshire

Tell us the postcode and what you need.

Enter a valid UK postcode.

Choose a service.

Enter your name.

Enter a phone number we can call.

Check the email address.

We use your details only to respond to this enquiry. See our privacy notice.

What the job covers

  • One programme and one finish across the whole building
  • Mineral wool systems where building height or guidance requires them
  • Higher-risk buildings follow the Building Safety Regulator's process in England
  • Planning permission is needed for flats and maisonettes
  • We work with managing agents on resident communication
A five-storey block of flats half re-clad in white and grey insulated render, with scaffolding on the brick half

Hampshire: walls, weather and approvals

Homes across the South East range from inter-war semis and post-war estates, which are mostly cavity-walled, to older solid-walled cottages and Victorian town terraces.

Exposure to wind-driven rain varies across Hampshire: sheltered town streets fare better than walls on high ground or facing the prevailing weather, and the render, beads and cill details are chosen with that in mind.

For blocks in Hampshire, we start with height, storeys and the planning position, because those decide the system.

Nation
England
Region
South East
Towns covered
Southampton, Portsmouth, Basingstoke, Gosport, Waterlooville, Aldershot, Farnborough, Fareham…
Guide price
From £110 per m² + scaffold · 0% VAT

England: planning and regulations

For houses, external wall insulation and render are often permitted development where the finish looks similar to the existing walls. Planning permission is usually needed in conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites (where cladding a house in stone, artificial stone, pebble dash, render, timber, plastic or tiles isn't permitted development), for flats and maisonettes, for commercial buildings, under an Article 4 direction, or where the look changes noticeably. Listed buildings need listed building consent.

Renovating more than half of a wall's area — insulating it, or stripping and re-rendering it — or more than a quarter of the building's whole external envelope brings in the energy requirements of Part L, so building control needs to be involved and the wall should reach about 0.30 W/m²K where that's technically, functionally and economically feasible.

Combustible materials are banned in the external walls of relevant buildings 18 metres and over (regulation 7(2)), and Approved Document B guidance also covers residential buildings with a storey 11 metres or more above ground. Higher-risk buildings go through the Building Safety Regulator.

How disruptive is it for residents?

Most work happens from scaffolding outside. Residents may need to allow brief access to extend window cills, vents or flues from the inside. We provide a notice for residents covering dates, scaffold, and how to raise concerns.

EWI for flats and blocks prices in Hampshire

EWI for flats and blocks guide prices
ItemGuide priceNotes
Mineral wool system on a low-rise block£110–£190 per m²0% VATPriced on survey
Scaffold and accessPriced per buildingIncludes licences where needed
Specification and pricing pack for consultationIncluded with quote

Confirmed by a fixed written quote after survey. 0% VAT: installing insulation in a home is zero-rated until 31 March 2027, so these figures are the total; 5% applies from 1 April 2027.

What happens next

  1. Enquiry

    Send your postcode and a few details.

  2. Measured survey

    Walls, damp, eaves, cills and services recorded.

  3. Written price

    A fixed price with the specification attached.

  4. Work and handover

    Installed, inspected and documents handed over.

Flats and blocks in Hampshire: questions

Can one flat have external wall insulation on its own?

Rarely. The outside walls are usually owned by the freeholder, the result would look patchy, and planning is unlikely. Whole-building schemes are the norm.

Do you work on high-rise buildings?

Tell us the height and number of storeys. Buildings in the higher-risk category have a separate regulatory route, and we'll say plainly if we're not the right contractor.

Do flats need planning permission for EWI?

Yes. Permitted development rights for external alterations apply to houses, not flats or maisonettes, so an application is needed.

Do you cover all of Hampshire?

Yes. We survey and quote EWI for flats and blocks across Hampshire, including Southampton, Portsmouth, Basingstoke, Gosport, Waterlooville.

Do I need planning permission in England?

For houses, external wall insulation and render are often permitted development where the finish looks similar to the existing walls. We check your address before quoting.

Flats and blocks in Hampshire

Start with a guide price, then fix it with a free survey in Hampshire.

Call freeGet a quote