External wall insulation · Kent
External wall insulation in Deal
If you're planning external wall insulation in Deal, start with a free survey: we measure, check the walls and confirm planning and building control for your address. We plan EWI in Deal around the details that cause trouble later — cills, eaves, downpipes and the base of the wall above the damp-proof course.
- Free survey in CT14 and nearby
- Guide price from £105 per m² + scaffold, 0% VAT
- Fixed written price before work starts
Free survey in Deal
Postcode, service and a phone number is all we need.
Part of every quote
- Typically takes a 225mm solid brick wall from around 2.1 W/m²K to about 0.30 W/m²K with 90–110mm of board
- Work happens outside, so you can live at home throughout
- Boards chosen for the wall: EPS, mineral wool, wood fibre or phenolic
- Cills, pipes, vents, meter boxes and the roofline detailed as part of the job

What we look for in Deal
As well as Deal itself, we quote in Dover, Ramsgate and Broadstairs. It's roughly 38 miles from Deal to Maidstone, the largest town in Kent. Homes across the South East range from inter-war semis and post-war estates, which are mostly cavity-walled, to older solid-walled cottages and Victorian town terraces.
Much of Kent sits in the lower wind-driven rain exposure bands, which keeps the choice of finishes wide — though hilltop, coastal and exposed gable walls can still need a tougher specification, so we check the actual site.
Whole-house jobs and single elevations are both quoted in Deal; a cold gable or rear wall can be done on its own where it suits.
- Postcode district
- CT14
- County or area
- Kent
- Nation
- England
- Nearby
- Dover, Ramsgate, Broadstairs, Margate
Permissions in England
Planning in Deal follows England's national rules: similar-looking finishes on houses are usually permitted, while flats, commercial premises, conservation areas and streets under an Article 4 direction need an application.
Building control applies once more than half of a wall is insulated or re-rendered, or more than a quarter of the whole building envelope, and your written quote says how that's handled.
What does the survey check before EWI is specified?
- Wall construction and condition, including any damp, cracking or loose render
- Ground levels and the damp-proof course, so the system starts above splash height
- Eaves depth, verges and whether the roofline needs extending
- Window positions, cill depths and reveal space
- Services on the wall: gas, electric meters, flues, soil pipes, satellite dishes and lights
- Planning and Building Regulations position for your property and nation
External wall insulation prices in Deal
| Item | Guide price | Notes |
|---|---|---|
| EPS system with silicone render | £105–£145 per m²0% VAT | Most common choice for houses |
| Mineral wool system | £125–£170 per m²0% VAT | Non-combustible, vapour-open |
| Brick-slip finish over insulation | £185–£260 per m²0% VAT | Where a brick look is wanted |
| Three-bed semi, EPS + silicone (incl. scaffold) | £10,200–£17,7000% VAT | 80–100 m² of wall; depends on detailing and access |
Confirmed by a fixed written quote after survey. 0% VAT: installing insulation in a home is zero-rated until 31 March 2027, so these figures are the total; 5% applies from 1 April 2027.
From enquiry to finished wall
Tell us about the property
Use the quote tool or form, or call. Photos help.
Free survey
We measure, check the walls and confirm approvals.
Fixed written quote
System, details, access, exclusions and VAT in writing.
Installation
Scheduled for suitable weather, with a clear programme.
External wall insulation in Deal: questions
Does external wall insulation cause damp?
Not when it is specified and detailed properly. Problems usually come from poor detailing: no starter track above the damp-proof course, gaps at cills and penetrations, or a vapour-closed system on a wall that needs to breathe. The survey checks moisture, ground levels and the wall type before a system is chosen.
Does EWI need Building Regulations approval?
In England and Wales, usually. Insulating more than half of a wall's area, or more than a quarter of the building's whole external envelope, counts as renovating a thermal element, so building control needs to be involved and the wall should reach about 0.30 W/m²K where that's practical. Scotland and Northern Ireland have their own building standards processes.
Can EWI go over pebble dash?
Usually yes. The dash is tested for adhesion and hollow areas; sound dash can be insulated over with additional mechanical fixings, while loose areas are removed first.
Do you cover Deal?
Yes — we survey and quote external wall insulation in Deal (CT14) and nearby Dover, Ramsgate and Broadstairs, with a fixed written price before any work starts.