Commercial EWI · Greater London
Commercial and public building EWI in Greenford
Need commercial external wall insulation in Greenford? Tell us about the property and we'll arrange a free survey and a written quote. For commercial premises in Greenford, we programme the work around opening hours so the building can keep trading.
- Free survey in UB6 and nearby
- Guide price from £110 per m² + scaffold, + VAT
- Fixed written price before work starts
Free survey in Greenford
Postcode, service and a phone number is all we need.
What the job covers
- Contract roles under CDM 2015 agreed at the start
- Colour and texture options to suit brand or setting
- Non-combustible systems where use or height requires them
- Clear handover file with system documentation

Greenford: walls, weather and approvals
We cover Greenford and nearby Northolt, Southall and Wembley. London's housing includes a large stock of Victorian and Edwardian solid-wall terraces, inter-war semis and post-war blocks, and conservation areas cover many streets — so planning is often the first question for external work.
Much of Greater London sits in the lower wind-driven rain exposure bands, which keeps the choice of finishes wide — though hilltop, coastal and exposed gable walls can still need a tougher specification, so we check the actual site.
Schools and community buildings around Greenford are usually phased by elevation, with noisy stages in holidays where possible.
- Postcode district
- UB6
- County or area
- Greater London
- Nation
- England
- Nearby
- Northolt, Southall, Wembley, Hayes
Permissions in England
Planning in Greenford follows England's national rules: similar-looking finishes on houses are usually permitted, while flats, commercial premises, conservation areas and streets under an Article 4 direction need an application.
Insulating or re-rendering more than half of a wall's area brings in Part L of the Building Regulations, so building control is notified and the wall is upgraded to about 0.30 W/m²K where practical.
On residential buildings with a storey 11 metres or more above ground, guidance points to non-combustible external wall materials, and combustible materials are banned in relevant buildings 18 metres and over, so we specify mineral wool systems there.
Does commercial EWI need planning permission?
Generally yes — permitted development rights for external wall changes are written for houses. Applications need elevations showing the projection, finish and colours, and details at eaves and openings.
Commercial and public building EWI prices in Greenford
| Item | Guide price | Notes |
|---|---|---|
| Insulated render system | £110–£200 per m²+ VAT | Priced on survey |
| Render refurbishment without insulation | £55–£95 per m²+ VAT | Silicone or mineral |
| Access and scaffold | Per building | Includes edge protection |
Confirmed by a fixed written quote after survey. Business prices shown before VAT, which is added at 20%. Buildings used solely for a relevant charitable purpose can qualify for 0% on insulation.
What happens next
Enquiry
Send your postcode and a few details.
Measured survey
Walls, damp, eaves, cills and services recorded.
Written price
A fixed price with the specification attached.
Work and handover
Installed, inspected and documents handed over.
Commercial EWI in Greenford: questions
Can the building stay open during the works?
Usually, yes. The work is phased and the scaffold layout keeps entrances and escape routes clear.
Is VAT 0% on commercial insulation?
Usually not. The zero rate covers insulation installed in residential accommodation and, since 1 February 2024, buildings used solely for a relevant charitable purpose, such as many charity-run village halls. Other commercial work is standard-rated.
Do you provide a maintenance plan?
Yes — the handover includes the system documents and recommended inspection and cleaning intervals.
Do you cover Greenford?
Yes — we survey and quote commercial external wall insulation in Greenford (UB6) and nearby Northolt, Southall and Wembley, with a fixed written price before any work starts.